Logo
Loading...

View User Details

Hinokami_Kagura
forum-grunt
4
Posts
0
Likes
77
Views

Latest Posts

North & South America Region / Regional Channels / Bolivia / Appeals LAN / Solved

Nick de RGC del administrador del cyber: snk

Nombre del Cyber: ramzi-win....!

https://prnt.sc/rGSpMhbXhdTq

 

Razón : Tengo un cyber el día de ayer 20/02/2017 entro un cliente normal como de costumbre cuando el cliente se fue mi maquina no podia ser mas utilizada ya que saltaba un ban en la  pc, como ustedes saben no puedo mirar a cada cliente que  hace o que no hace. De todas maneras yo como dueño del cyber me comprometo a controlar un poco mas a los clientes  y si vuelve a pasar esto solo esperare que pasen los dias de ban espero su compresión gracias .
 

 

sir plz ; chance unbanne  me  tnx .


 

 

RGC Workshop / Suggestions

gg

Member Service Center / Technical Support / Solved

open rgs khlona  nala3bo 

Europe Region / (EU) Higher / Vouch Request / Granted

Your RGC nick:  Hinokami_kagura
Brief text about yourself: im 26 year's old from algeria
DotA experience: i've started playing dota in 2009, i wasnt playing much back then till 2012 when i started playing dota 2, been in a lot of breaks since then, i came back to rgc in 2015, playing from time to time,
DotA skill: even that i don't play much in both games dota 1/ dota 2 but im still a divine 3 in dota 2, i consider my self a ms+, coz im not really used to dota 1 gameplay ( i mean i feel better while playing dota 2 )
DotA roles: usually i play pos 1/2, but im comfortable playing any role / hero
RGC stats: https://ladder.rankedgaming.com/index.php?room=19&s=hinokami_kagura ( lobby % win is 70% )

 

Activity Logs

There are 2 new tasks for you in “AirPlus Mobile APp” project:
Added at 4:23 PM by
img
Meeting with customer
Application Design
img
img
A
In Progress
View
Project Delivery Preparation
CRM System Development
img
B
Completed
View
Invitation for crafting engaging designs that speak human workshop
Sent at 4:23 PM by
img
Task #45890merged with #45890in “Ads Pro Admin Dashboard project:
Initiated at 4:23 PM by
img
3 new application design concepts added:
Created at 4:23 PM by
img
New case #67890is assigned to you in Multi-platform Database Design project
Added at 4:23 PM by
Alice Tan
You have received a new order:
Placed at 5:05 AM by
img

Database Backup Process Completed!

Login into Metronic Admin Dashboard to make sure the data integrity is OK
Proceed
New order #67890is placed for Workshow Planning & Budget Estimation
Placed at 4:23 PM by
Jimmy Bold